<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" >

<channel><title><![CDATA[Steve Bishop and The Most Dangerous Detective - CLAIM: PLANS FOR TOWN ON PROTECTED WETLANDS \"NOW WITH GOVERNMENT\"]]></title><link><![CDATA[http://www.stevebishop.net/claim-plans-for-town-on-protected-wetlands-now-with-government]]></link><description><![CDATA[CLAIM: PLANS FOR TOWN ON PROTECTED WETLANDS \"NOW WITH GOVERNMENT\"]]></description><pubDate>Mon, 22 Jun 2026 11:49:38 +1000</pubDate><generator>Weebly</generator><item><title><![CDATA[CLAIM: PLANS FOR TOWN ON PROTECTED WETLANDS                                         "NOW WITH GOVERNMENT"]]></title><link><![CDATA[http://www.stevebishop.net/claim-plans-for-town-on-protected-wetlands-now-with-government/claim-plans-for-town-on-protected-wetlands-now-with-government]]></link><comments><![CDATA[http://www.stevebishop.net/claim-plans-for-town-on-protected-wetlands-now-with-government/claim-plans-for-town-on-protected-wetlands-now-with-government#comments]]></comments><pubDate>Fri, 18 Mar 2022 02:01:54 GMT</pubDate><category><![CDATA[Uncategorized]]></category><guid isPermaLink="false">http://www.stevebishop.net/claim-plans-for-town-on-protected-wetlands-now-with-government/claim-plans-for-town-on-protected-wetlands-now-with-government</guid><description><![CDATA[According to a major developer, a study designed to demonstrate that building a town on internationally protected wetlands will benefit the environment has been lodged with the Morrison Government.Walker Corporation plans to build a town with a population of about 7,200 on RAMSAR-listed wetlands at Toondah Harbour in Queensland's Moreton Bay.It says it has submitted the draft environmental impact statement (EIS) required under the Environment Protection and Biodiversity Conservation Act.But ther [...] ]]></description><content:encoded><![CDATA[<div class="paragraph"><font size="3"><span>According to a major developer, a study designed to demonstrate that building a town on internationally protected wetlands will <a href="http://epbcnotices.environment.gov.au/_entity/annotation/f4225aa8-9b56-e911-b854-005056842ad1/a71d58ad-4cba-48b6-8dab-f3091fc31cd5?t=1614136912038"><span>benefit the environment</span></a> has been lodged with the Morrison Government.</span><br /><br /><span><a href="https://www.toondah-harbour.com.au/">Walker Corporation</a></span><span> plans to build a town with a population of about 7,200 on RAMSAR-<a href="https://www.toondah-harbour.com.au/storage/2020/12/November-2019_-Toondah-Harbour-EIS-fact-sheets.pdf"><span>listed wetlands</span></a> at Toondah Harbour in Queensland's Moreton Bay.</span><br /><br /><span>It says it has submitted the draft environmental impact statement (EIS) required under the Environment Protection and Biodiversity Conservation <a href="https://www.awe.gov.au/environment/biodiversity/legislation"><span>Act</span></a>.</span><br /><br /><span>But there is confusion, with a spokesman for the Department of Agriculture, Water and the Environment saying a revised draft was still being prepared by Walker.</span><br /><br /><span>By law, the EIS "must demonstrate how a <a href="http://epbcnotices.environment.gov.au/_entity/annotation/f4225aa8-9b56-e911-b854-005056842ad1/a71d58ad-4cba-48b6-8dab-f3091fc31cd5?t=1614136912038"><span>net benefit</span></a> will be achieved for the Moreton Bay Ramsar site and other matters of national environmental significance."</span><br /><br /><span>The corporation boasts it has "<a href="https://www.toondah-harbour.com.au/"><span><em>support</em></span></a><em> from both state and local government"</em> for the town of 3,600 homes.</span><br /><br /><span>But internal Federal Government advice has warned the project: ".<em>.. is l</em><a href="https://www.aph.gov.au/DocumentStore.ashx?id=26ac80ec-128f-40c6-b2cf-5cf6e532c55a"><span><em>ikely to have a significant impact </em></span></a><em>on the ecological character of the Moreton Bay Ramsar site...; listed threatened species, including marine turtles and the critically endangered ; Eastern Curlew...; and listed migratory species, including the Dugong."</em></span><br /><br /><span>There appears to have been no announcement that the EIS has been lodged.</span><br /><br /><span>This week the main Walker Corporation website still reported: "A comprehensive Environment Impact Statement...is <a href="https://www.toondah-harbour.com.au/environmental/"><span>currently being finalised</span></a>,..."</span><br /><br /><span>But a spokesman confirmed a draft statement had been submitted. He refused to answer further questions about the process.</span><br /><br /><span>In <a href="https://www.toondah-harbour.com.au/talk-toondah/sessions/eis-process-overview-intro-video/"><span>mid-2020</span></a> Sam Maynard, principal environmental scientist and associate partner of Saunders Havill Group, said during a question and answer session organised by Walker Corporation: "<em>We hope to have the draft completed by November of this year.."</em></span><br /><br /><span>Mr Maynard has been <a href="https://www.toondah-harbour.com.au/talk-toondah/sessions/eis-process-overview-intro-video/"><span>superintending</span></a> the EIS process for the project but despite having <a href="https://www.toondah-harbour.com.au/talk-toondah/sessions/eis-process-overview-talk-toondah-recording/"><span>answered questions</span></a> from the public during two videoed sessions, he refused to take a phone call from me, saying through a third party: <em>"He does not want to make any comment or answer any questions at this time."</em></span><br /><br /><span>If the minister approves the EIS, it will be made public so that people and organisations can make submissions.</span><br /><br /><span>During different stages of the project there was a total of 3,782 public submissions in 2015, 2017 and 2018 with many of them <a href="https://ehq-production-australia.s3.ap-southeast-2.amazonaws.com/d0f55abeaa8251e9a508005d69b26a8845258b48/documents/attachments/000/073/936/original/submissions-report-toondah-harbour.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&amp;X-Amz-Credential=AKIAIBJCUKKD4ZO4WUUA/20220316/ap-southeast-2/s3/aws4_request&amp;X-Amz-Date=20220316T052140Z&amp;X-Amz-Expires=300&amp;X-Amz-SignedHeaders=host&amp;X-Amz-Signature=5b131896f87f50793e4bd4b0788e2d2f8609329add9161032a83a3ecac930077"><span>opposed </span></a>to the development, and <a href="https://www.parliament.qld.gov.au/Work-of-the-Assembly/Petitions/Petition-Details?id=3271"><span>more than 6,000 </span></a>signed a petition opposing it in 2020.</span><br /><br /><span>The draft EIS has been a long time coming. A Walker website reports: "<a href="https://www.walkercorp.com.au/news/2015/12/toondah-harbour-plans-unveiled/"><span><em>During 2016</em></span></a><em> we will prepare an Environmental Impact Statement (EIS) report that will address all of the potential environmental, social and economic impacts of the project."</em></span><br /><br /><span>A spokesman for the Department of Agriculture, Water and the Environment said:&nbsp;</span><br /><span>&nbsp;</span><br /><span>"I<em>n April 2021, Walker Group Holding Pty Limited (Walker) provided a draft Environmental Impact Statement (EIS) to the department for consideration.</em></span><br /><br /><span><em>"The EPBC Act requires the department review this documentation to ensure it is in accordance with the </em><a href="https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fepbcnotices.environment.gov.au%2F_entity%2Fannotation%2Ff4225aa8-9b56-e911-b854-005056842ad1%2Fa71d58ad-4cba-48b6-8dab-f3091fc31cd5%3Ft%3D1554647617164&amp;data=04%7C01%7Cmedia%40environment.gov.au%7C40e3ff1a8b0f4b91efc108da06f703a4%7C78f05d85d6b34eeba5c3948d2dcdae8a%7C0%7C0%7C637829955222374085%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&amp;sdata=fRXYll2PgLJtoH2xrCwWlgBg90ZlutHLuGqzo1gdisc%3D&amp;reserved=0"><span><em>finalised Guidelines for the preparation of a draft EIS</em></span></a><em> (Guidelines) prior to its publication.</em></span><br /><br /><span><em>"In August 2021, the department provided Walker with comments on the adequacy of the draft EIS meeting the requirements of the Guidelines and requested some further information.</em></span><br /><br /><span><em>"Currently, Walker is preparing the revised draft EIS.</em></span><br /><br /><span><em>"Under the EPBC Act, the Minister must not specify a period of less than 20 business days for public consultation."</em></span><br /><br /><span>But the spokesman for Walker Corporation said: "<em>A draft EIS has been submitted and the Federal Government has been reviewing that document. It&rsquo;s now up to them to decide on the timing of its release for the public notification period</em>..."</span></font><br /></div>]]></content:encoded></item></channel></rss>